Grade and standard
State the material designation and governing specification.
Factory Tour · Process principles
Review seamless steel tubes as a defined product and supply scope. Grade, dimensions, delivery condition and project documentation establish the route that must be confirmed for the order.
Nuclear-industry supply experience does not establish a blanket qualification for every code, class or application. Confirm the specific scope and supporting records for the project.
Symbolic geometry. The drawing defines values and tolerances.
Define the requirement
State the material designation and governing specification.
Specify outside diameter, wall thickness, length, drawing revision and dimensional acceptance.
Define heat treatment, tube ends, surface requirements, protection and packaging.
Process principles
Confirm the responsible manufacturing and supply route before agreeing availability. Keep the delivered lot linked to the approved order requirements.
Put the material, governing standard and supplied condition alongside the dimensions.
Define mechanical tests, NDT scope and applicable project inspection requirements.
Connect batch identification, material records, order references and the inspection certificate.
Agree document approval, tube-end protection, separation and packing acceptance before release.
Verification and records
Review the section, length, tube ends and critical mating requirements.
Agree the test scope and document approval process for the stated product and application.
Maintain the connection between lot identification, material records and release documentation.
Project review
Send the material or drawing definition, intended use and the acceptance records needed for review.