NINGBO EMPIREIndustrial components & materialsRequest a quote
Menu

Supplier Qualification

The information overseas purchasing and SQE teams ask for during supplier on-boarding and audits — legal entity, manufacturing footprint, quality system, traceability and problem solving — in one page. Anything not covered here is can be discussed with our team for your specific sourcing program.

Start a Qualification RFQQuality & Certifications

Legal Entity

Legal nameNingbo Empire Advanced Material Co., Ltd.
Unified Social Credit Code913302010538459634
Legal entity established2012, Ningbo, Zhejiang, China
Manufacturing rootsFerrite manufacturing business established in 1999
Contact addressNo.2432 East Baizhang Road, Ningbo, Zhejiang, China
Product focusPermanent magnets, magnetic assemblies, precision metal components and advanced electronic materials

Request the current business license and contracting-entity details during supplier onboarding. Confirm payment instructions directly with your established contact before transferring funds.

Manufacturing Footprint

  • Transparent manufacturing model — owned magnet, magnetic-assembly and LTCC production plus qualified long-term strategic bases for precision metal components
  • Metal component processes — die casting, forging, CNC machining and investment casting for the metal components family
  • Producing site per part number — confirm the production site, process route and applicable certification scope before a purchase order is released
  • Site review — discuss on-site or remote assessment, required documents and an agreed schedule with the project team

What Your SQE Will Ask — Answered Up Front

Quality System

Management-system certification records — ISO 9001:2015 and IATF 16949:2016 for automotive programs — with holder, site, scope and original validity periods published on our Quality page. The current certification status applicable to your producing site is confirmed during quotation.

Inspection Planning

Incoming, in-process and final inspection per the agreed plan. AQL levels, critical characteristics and measurement methods are fixed together with your SQE during project launch.

Traceability

Define lot identification, material records and inspection traceability for the part. Record-retention periods and the documents supplied with each shipment are agreed in the project quality plan.

Change Control

Agree the notification and approval process for changes to material, tooling, process or production site. Specify any automotive PPAP or part-submission requirements in the quality agreement.

8D / CAPA

Set the escalation contacts and response requirements before production. Where required by the project, use an 8D or corrective-action process covering containment, root-cause analysis and effectiveness checks.

Export Support

Ningbo-based export coordination with access to Ningbo-Zhoushan Port. Confirm the delivery term, destination, packaging and applicable transport or export documentation in the quotation; magnet shipping requirements depend on the shipment.

Documentation We Can Provide

  • Quality agreement — inspection plan, AQL, reaction plans and escalation path agreed in writing
  • PPAP / FAI packages — to the level agreed with your SQE, per project
  • Compliance declarations — RoHS, REACH, and conflict-minerals reporting (CMRT/EMRT) on request
  • Qualification checklist — send your required records so availability and any project-specific preparation can be confirmed

On-boarding a New Program

1. RFQ & NDA

Send your drawing and requirements; mutual NDA signed if needed.

2. Site & Cert Confirmation

We confirm the producing site, applicable certificates and capacity.

3. Sample & FAI

Agree sample quantity, acceptance criteria and the inspection records needed for approval.

4. Audit (Optional)

On-site or virtual audit at a mutually agreed time.

5. Production Release

Confirm sample approval, supply terms and the applicable quality agreement before series production.

Preparing a Supplier Audit?

Send your part requirements and qualification checklist. We will review the proposed production route and the supporting information your team needs.